Supervising the implementation of the development of Al-Maadi Hospital that belongs to the Arab Organization for Industrialization.
Implementation Supervision
Arab Organization for Industrialization
Supervising the implementation of the development of Al-Maadi Hospital that belongs to the Arab Organization for Industrialization.
Supervising the implementation of the construction of the petrol station – Assuit garage (Upper Egypt for Transport and Tourism of Gastec Company) with a total investment of 25 million pounds.
Designing and supervising the implementation of Dahshur Axis Project (recreational area in Zayed City with a total number of six malls, restaurant chains, rental areas with a total investment of 150 million pounds), Sheikh Zayed City.
Supervising the implementation of 183 residential buildings and utility services (roads – sanitary drainage systems- water – irrigation – electricity -landscaping services) with a total investment of 2 billion pounds for the third phase of the Social Housing Project – 10th announcement – Hurghada.
Strong foundations need prior research; that is why CEB conducts thorough research and soil mechanics studies to overcome geological constraints and challenges according to the soil types. Here is a list of some of the projects we participated at: 1-Study of soil mechanics for the Meer middle school project. Investor: Educational Buildings Authority 2-Study of […]