Supervising the implementation of 750 villas in Hurghada (belonging to the Electronics Factory – Arab Organization for Industrialization).
Implementation Supervision
Electronics Factory - Arab Organization for Industrialization
Hurghada
Supervising the implementation of 750 villas in Hurghada (belonging to the Electronics Factory – Arab Organization for Industrialization).
Strong foundations need prior research; that is why CEB conducts thorough research and soil mechanics studies to overcome geological constraints and challenges according to the soil types. Here is a list of some of the projects we participated at: 1-Study of soil mechanics for the Meer middle school project. Investor: Educational Buildings Authority 2-Study of […]
Engineering Consultancy Services for the Port Said Petrol Station (100 St.) of Gastec Company.
CEB‘s list of Construction Design Projects: 1-Consultancy and design services and the preparation of the brochure of conditions and specifications for the Social Housing Project (architecture – construction – electricity – sanitary drainage networks – potable water networks ). Project Authority: Ministry of Housing, Utilities, and Urban Communities 2-Consultancy services for the rehabilitation project of […]
Designing and supervising the implementation of Dahshur Axis Project (recreational area in Zayed City with a total number of six malls, restaurant chains, rental areas with a total investment of 150 million pounds), Sheikh Zayed City.